Key Notes
- Heathrow Express and Elizabeth line trains to the airport are suspended throughout November 28 and 29 as planned engineering works close the route into Paddington.
- The Piccadilly line will run normally, but passengers should plan their full terminal transfer and allow extra time, particularly when connecting from regional rail services.
Travellers using Heathrow this weekend will need to rethink transfers into London. Heathrow Express and Elizabeth line services to the airport are suspended throughout Saturday, November 28 and Sunday, November 29, while engineering work closes the rail approach to Paddington.
The Piccadilly line will run normally, according to Heathrow’s travel notice, providing an Underground alternative. The closure affects airport access rather than the flight timetable itself, so a confirmed flight still needs a workable journey to the terminal.
Which Rail Services Are Affected?
National Rail confirms there are no trains between Paddington and Heathrow or Maidenhead across the weekend. Heathrow Express is suspended, and the only Elizabeth line service operating is a limited two-trains-per-hour link between Reading and Maidenhead.
Replacement buses cover selected sections of the wider network, including Maidenhead–Slough and Slough–Ealing Broadway. They should not be mistaken for a normal through service between central London and Heathrow.
The disruption also changes Great Western Railway journeys. Some services terminate at Reading, while selected trains from the Bristol and South Wales corridor are diverted to Euston with longer journey times. Anyone combining a regional train with a flight should check the complete route, including the airport connection.
How to Reach Heathrow
The Piccadilly line serves the airport’s three Underground stations: one for Terminals 2 and 3, plus separate stations for Terminal 4 and Terminal 5. Heathrow’s Underground guide explains the terminal connections.
Before setting off, use the TfL journey planner for the specific departure time and terminal. Check first and last services if travelling early or late, and leave room for the walk from the station, baggage drop and security.
Passengers who need a road transfer should confirm the pickup point and allow for traffic. Those travelling with heavy luggage, children or mobility requirements should compare the number of changes as well as the advertised journey duration.
Why the Paddington Route Is Closing
The work is part of Network Rail’s Dolphin Junction upgrade between Slough and Langley. Changes to track, overhead power equipment and signalling are intended to reduce congestion and improve reliability on the approach to London.
For this weekend’s travellers, the useful action is to replace any saved Heathrow Express or Elizabeth line transfer plan before departure. A familiar route in an old itinerary will not reflect the November 28–29 timetable.
Disclaimer: TravelCapybara is an independent media brand owned and operated by NuvexMedia LLC, publishing travel news, destination guides, research, and insights. NuvexMedia LLC may invest in or collaborate with companies across the travel, hospitality, technology, and digital media sectors. These relationships do not influence TravelCapybara’s editorial coverage. While we strive for accuracy, travel requirements, prices, schedules, availability, and local conditions may change without notice. Readers should independently verify information before making travel or purchasing decisions. This content is for informational purposes only and does not constitute professional advice. © 2026 NuvexMedia LLC. All rights reserved.